low number of bug reports, 1.5.9 doing much better than 1.5.8
jmullan and Tim_j to drive 1.6 transition message (see last week's
GMC
gmc3 cutover went well, big props to fryfrog
performance is _much_ better
bharat owes fryfrog cash
fryfrog needs to follow up with newegg abotu refunding restocking fee
Gallery 2.3
2.3-RC2 is out
talmdal is only aware of notification issue and should be able to commit that fix today
2.3 final looks like its going to be pretty soon. How about 10/21?
GX Sprint
Bharat has a room for us at Google and it's awesome. hardware and food!
bharat still needs to know who needs computers
jmullan needs to coordinate who is bring a laptop and who isn't
everyone will need to use wireless
biggest time contributions we need now:
people to go through -devel mails and get the info into chad's spreadsheet to make sure that we have all the ideas: jozefs
people to come up with a comprehensive list of G2 features: Signe
make sure to flush out all weird edge casey things that we support
perhaps just go through all views/controllers?
multiroot, multilang, etc
jhilden will have personas by thursday
bharat is working on a CakePHP mockup and thinks it won't make the cut
talmdal is working with Zend Framework mockup and thinks it wont' make the cut. hopes to have prototypes up on gx.timalmdal.com, so far only kohana is up. will also take a look at symphony
jmullan will do one in Zend Framework
perhaps jhilden can do some wireframes for site admin?